Go to content

Buy Heliox Gas Mixture - REAL GAZ

Home          About us          Projects           Services           Products          Contacts
AZ | TR | RU | EN | GE
industrial gas cylinder rack system โ€” an integrated frame, header and regulator package
An industrial gas cylinder rack system combines a frame, a manifold, pressure regulation and safety fittings into a single package that can be installed beside a production line. REAL GAZ designs the arrangement around the gas, the flow rate and the number of users.
Instead of managing individual cylinders at each workstation, the plant gets a central supply with automatic changeover and a tidy, inspected layout.
Components are selected under EN ISO 2503 for pressure regulators, EN ISO 7291 for manifold regulators, EN ISO 14175 for shielding gases and EN 1089-3 for identification.
The rack is sized from the plant's consumption data. A shop with ten welding stations drawing 15 litres per minute each needs a different header, regulator capacity and cylinder count than a packaging line that draws a steady flow of nitrogen. We calculate the pressure drop along the pipework, choose a line pressure that matches the end equipment and recommend a safe location, usually outside the production hall or in a ventilated gas room. Duty and standby banks are connected through a changeover regulator, with a pressure switch or gauge that tells the operator when the duty bank is nearly empty. Pipework is stainless steel, copper or aluminium according to purity and compatibility, and stations are fitted with isolation valves and flashback protection where flammable gases are present.

๐Ÿญ Where Industrial Cylinder Rack Systems Are Used
  • โš™๏ธ Metal fabrication โ€” argon/COโ‚‚ headers supply many MAG welding stations from one point;
  • ๐Ÿ”ฌ Food and beverage โ€” carbon dioxide and nitrogen racks serve carbonation and packaging lines;
  • ๐Ÿฅ Electronics assembly โ€” high-purity nitrogen systems protect soldering atmospheres;
  • ๐Ÿš€ Glass and ceramics โ€” oxygen and fuel gas racks feed forming and finishing burners.

๐Ÿ’ก Why Choose REAL GAZ
  • โœ… Central supply โ€” one rack replaces dozens of stand-alone cylinders;
  • ๐Ÿงช Automatic changeover โ€” a duty and standby bank prevents running out mid-shift;
  • ๐ŸŽฏ Flexible expansion โ€” additional cylinder positions can be added later;
  • ๐Ÿ”’ Safety fittings โ€” non-return valves and flashback arrestors are included where required;
  • ๐Ÿ“„ Certificate of Analysis (CoA) โ€” supplied with every order.

๐Ÿ”ฌ Quality Control & Safety
  • pressure test of manifold and pipework;
  • commissioning checks of regulators and gauges;
  • leak survey after installation;
  • annual inspection plan offered to customers.
Cylinders replaced at the rack are supplied and returned under ADR / UN carriage rules.

โš™๏ธ Trusted Gas Solutions
Production engineers across Turkey, Georgia, Uzbekistan and the USA contact REAL GAZ to specify an industrial gas cylinder rack system that matches line demand, pressure and local regulations, with refills scheduled to fit the shift pattern.
REAL GAZ โ€” central supply, simple running.
You can send your positive/negative feedback on our products and services to the following email: [email protected]

ยฉ REALGAZ - All rights reserved.
Site developed by AYVUS.COM
Back to content